Ithiel
Pet breeding, consumer lead generation · Ithiel Studio client work

doggy.net: a 7-stage AI content pipeline, first approved post published 21 hours after the site build

An SEO content hub for a family of dog breeding brands. An agent pipeline researches, drafts, fact-checks and audits each post. Nothing goes live until a person clicks approve.

pipeline stages before a draft reaches a human
7
built April 21 to 22, 2026
from the full site build commit to the first approved pipeline post
21 hours
April 21 to 22, 2026
pipeline posts committed through the approval link, 2,222 and 2,518 words, only the first reachable on staging
2
April 22 and 23, 2026

The problem

The client runs several dog breeding brands, each with a small site built around an application form. Search traffic was split across satellite domains and none carried real content. The client owned doggy.net and wanted one educational hub that ranks, then hands readers to the right brand. Nobody could write two posts a week, and unreviewed AI copy under a breeder's name was not acceptable.

Discovery

The plan was a 48-hour demo with one hand-written post. While scoping it I saw that the site was the easy part. The real question was whether the client would trust what the machine wrote. So the first pipeline was replaced within the hour by a 7-stage version with real web research and a separate fact-check. Approval changed too. I started with Telegram deep links, then moved to HMAC-signed email links the next day, because one click in an inbox is what a busy owner will use.

What it does

  1. 01

    The pipeline

    Topic brief, web research, outline, draft, edit, fact-check, SEO audit. The result is saved as pending approval with the fact-check and SEO reports attached.

  2. 02

    One-click approval

    The approval email carries a signed link. Clicking it verifies the token, marks the post scheduled, and commits it to the site repository, which triggers a deploy. A second click does nothing.

  3. 03

    Chat with the site

    A Telegram bot and an admin web chat run Claude over 7 tools, including pending approvals, approve, reject and recent leads. The bot is capped at 5 tool turns.

  4. 04

    The site

    Breed pages, guides, a brands page that routes to the family's breeding sites, and an application form that stores leads. Sitemap and JSON-LD included.

Timeline

  1. April 14 to 15, 2026

    48-hour demo scoped. A 23-file scaffold committed.

  2. April 21, 2026, 20:29 UTC

    Full site build committed. SEO hardening and photo fixes the same evening.

  3. April 22, 2026, 00:39 to 01:11 UTC

    Blog pipeline committed, then rebuilt as 7 stages with web research and verification.

  4. April 22, 2026, 17:52 UTC

    First pipeline post approved and committed by the pipeline's own author identity.

  5. April 23, 2026

    Second pipeline post approved and committed. Last activity in the repository.

Before and after

Steps between a draft and the live siteManual writing and manual publishingOne click on a signed email link
Posts published through the pipeline02 committed in two days, 1 reachable on staging
Organic trafficnot measurednot measured
Application form leads from the hubnot measurednot measured

The arithmetic

The full site build was committed on April 21 at 20:29 UTC. The first pipeline post was committed on April 22 at 17:52 UTC: 21 hours and 23 minutes. Inside that window I also built the pipeline twice, the Telegram bot, the web chat and the approval endpoints. The two posts run 2,222 and 2,518 words. The staging sitemap lists 31 URLs today. I found no traffic, ranking or lead numbers, so none are claimed.

What stays with people

Every post stops at pending approval. A person approves or rejects by email link, by Telegram, or in the admin dashboard. The approval token is an HMAC of the post ID, so links cannot be guessed. The publish commit is made under a separate pipeline author name, which keeps a record of which posts came from the machine.

Limits

This demo proved the mechanism. It has no traffic result. The doggy.net domain does not serve this build today, and the work lives on a Vercel staging URL. Only the first pipeline post is reachable there. The second was committed but returns 404. I could not confirm whether the twice-weekly schedule still runs. Satellite domain redirects and the email agent were deferred. The repository stops on April 23, 2026.

What is next

Point the domain at the build and redeploy so the second post is live. Install analytics and Search Console. Then let the schedule run for 30 days and report impressions, clicks to the breeding sites, and applications by source.

  • SEO
  • content pipeline
  • human approval
  • Temporal
  • Claude
  • Supabase
  • Telegram bot
  • lead generation

Book a call

Tell us where your leads stall.

Book a call with Gerrit. If an agent fits, the next step is a paid Scope that ends with a fixed build price.