doggy.net: a 7-stage AI content pipeline, first approved post published 21 hours after the site build
An SEO content hub for a family of dog breeding brands. An agent pipeline researches, drafts, fact-checks and audits each post. Nothing goes live until a person clicks approve.
- pipeline stages before a draft reaches a human
- 7
- built April 21 to 22, 2026
- from the full site build commit to the first approved pipeline post
- 21 hours
- April 21 to 22, 2026
- pipeline posts committed through the approval link, 2,222 and 2,518 words, only the first reachable on staging
- 2
- April 22 and 23, 2026
The problem
The client runs several dog breeding brands, each with a small site built around an application form. Search traffic was split across satellite domains and none carried real content. The client owned doggy.net and wanted one educational hub that ranks, then hands readers to the right brand. Nobody could write two posts a week, and unreviewed AI copy under a breeder's name was not acceptable.
Discovery
The plan was a 48-hour demo with one hand-written post. While scoping it I saw that the site was the easy part. The real question was whether the client would trust what the machine wrote. So the first pipeline was replaced within the hour by a 7-stage version with real web research and a separate fact-check. Approval changed too. I started with Telegram deep links, then moved to HMAC-signed email links the next day, because one click in an inbox is what a busy owner will use.
What it does
- 01
The pipeline
Topic brief, web research, outline, draft, edit, fact-check, SEO audit. The result is saved as pending approval with the fact-check and SEO reports attached.
- 02
One-click approval
The approval email carries a signed link. Clicking it verifies the token, marks the post scheduled, and commits it to the site repository, which triggers a deploy. A second click does nothing.
- 03
Chat with the site
A Telegram bot and an admin web chat run Claude over 7 tools, including pending approvals, approve, reject and recent leads. The bot is capped at 5 tool turns.
- 04
The site
Breed pages, guides, a brands page that routes to the family's breeding sites, and an application form that stores leads. Sitemap and JSON-LD included.
Timeline
April 14 to 15, 2026
48-hour demo scoped. A 23-file scaffold committed.
April 21, 2026, 20:29 UTC
Full site build committed. SEO hardening and photo fixes the same evening.
April 22, 2026, 00:39 to 01:11 UTC
Blog pipeline committed, then rebuilt as 7 stages with web research and verification.
April 22, 2026, 17:52 UTC
First pipeline post approved and committed by the pipeline's own author identity.
April 23, 2026
Second pipeline post approved and committed. Last activity in the repository.
Before and after
| Measure | Before | After |
|---|---|---|
| Steps between a draft and the live site | Manual writing and manual publishing | One click on a signed email link |
| Posts published through the pipeline | 0 | 2 committed in two days, 1 reachable on staging |
| Organic traffic | not measured | not measured |
| Application form leads from the hub | not measured | not measured |
The arithmetic
The full site build was committed on April 21 at 20:29 UTC. The first pipeline post was committed on April 22 at 17:52 UTC: 21 hours and 23 minutes. Inside that window I also built the pipeline twice, the Telegram bot, the web chat and the approval endpoints. The two posts run 2,222 and 2,518 words. The staging sitemap lists 31 URLs today. I found no traffic, ranking or lead numbers, so none are claimed.
What stays with people
Every post stops at pending approval. A person approves or rejects by email link, by Telegram, or in the admin dashboard. The approval token is an HMAC of the post ID, so links cannot be guessed. The publish commit is made under a separate pipeline author name, which keeps a record of which posts came from the machine.
Limits
This demo proved the mechanism. It has no traffic result. The doggy.net domain does not serve this build today, and the work lives on a Vercel staging URL. Only the first pipeline post is reachable there. The second was committed but returns 404. I could not confirm whether the twice-weekly schedule still runs. Satellite domain redirects and the email agent were deferred. The repository stops on April 23, 2026.
What is next
Point the domain at the build and redeploy so the second post is live. Install analytics and Search Console. Then let the schedule run for 30 days and report impressions, clicks to the breeding sites, and applications by source.
- SEO
- content pipeline
- human approval
- Temporal
- Claude
- Supabase
- Telegram bot
- lead generation